METRO TRANSIT: CRENSHAW/LAX CONNECTOR

The Resonance team worked with Kleinfelder/Metro as the acoustical engineer for the construction of the Crenshaw Line. The scope included a review of the contractor’s RFIs and submittals with respect to construction noise control and a review of noise monitoring plans and reports. Our team worked alongside the contractor’s acoustical engineer in reducing construction noise to the adjacent sensitive receivers (e.g., residences).

The Crenshaw Line/LAX Connector Transit Project is an 8.5-mile light-rail line, with eight stations, including Leimert Park and Hindry. The rail line runs between the Expo Line on Exposition Blvd. and the Metro Green Line. It consists of above-ground (La Brea Ave./La Cienega Blvd. and 405 Freeway/Century Blvd.) and tunneled segments (Exposition Blvd. to 48th St/59th Pl to 67th St/Los Angeles International Airport South Runways) with all remaining areas at ground level.

Pin It on Pinterest

Resonance Acoustics
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.