The project consisted of the demolition of existing modular structures and the construction of a new 88,000 gross square foot modern, efficient steel-framed building. There is a 425-seat auditorium, two 180-seat classrooms, and a 4-story wing with the first 3 floors of classrooms and a 4th floor for offices.
The scope of services included sound isolation, room acoustics, and MEP/HVAC Noise and Vibration analysis. These services extend from the Schematic Design phase through Construction Administration.